Idaho Milk Products
Location: Jerome, Idaho

PROJECT SPECS

PROJECT DETAILS

Outfitted with 3-5000 Amp Services, one 1MW emergency backup generator and with provisions for an additional 5000 Amp Service, this project consisted of new construction of a concrete, steel-framed receiving and processing plant that increased Idaho Milk Products processing to more than 3 million lb of milk per day. The new building holds not only the processing and receiving areas, but also houses warehouse space and an administrative support facility. Interior finishes include office finishes, dairy tile, insulated metal panel ceilings and walls in process areas, sealed concrete walls, galvanized structural steel in the dryer towers, and epoxy-coated steel in other wet-process areas. Virtual design was used to reduce the design development process and kick-start the design-build project. This process significantly reduced design time and made it possible to mobilize on the site and start moving dirt within a month of receiving notice to proceed.