The work of the 100-E contract is a power system upgrade. This includes replacing all the existing electrical equipment with new equipment adding new power services for the five major pumping facilities located at the treatment plant.
Hacienda Pump Station
The project consists of upgrading of the electrical and instrumentation system at the Hacienda Pumping Station including the Rate if Flow Control (ROFC) system.